Bell Furnace Detail

Hydrogen Brazing Line

This bell furnace installation was supplied for hydrogen brazing of cutting edges into drilling heads.

The installation has two bases, one heating chamber and a parking base. The heating chamber is placed over whichever base needs to be processed, while the other base is available for loading and unloading.

The process is controlled by a Eurotherm 900EPC and uses pneumatically operated valves to control the hydrogen flow, thus ensuring that there are no possibility of ignition sources.

The control system is switched to whichever base is being utilised.